Hi All While creating the timesheet in the project module i am getting the following error: " Timesheet periods have not been created for: " I checked the user is mapped with the worker, period type is defined on the worker form, periods are created. Also when i click on new timesheet in the worker field drop down there is no worker showing. Also in the error after "for:" there is no worker ID. I am not getting what i missed in the setup, please advise Thanks in advance
↧