You use multiple Routes for the SubAssembly item. 1. On the sub ass. Item: Add a route with the sub assembly operations approve and activate this one. 2. On the sub ass. Item: Add a route with no operations and approve it (not active) 3. On your main item. On the BOM line for the sub assembly: Add the route with no operations in the Sub Route field.
↧