Yes. It is somewhat irritating. The site dimension is pretty limiting this way. So you basically can attack this from two perspectives: Item or resource. I have some suggestions based on some assumptions (which is always almost never a good thing) Resource: Do you normally end up with your finished goods being completed on one site? Could you then just assign all your manufacturing resources to this site? Item: Can you create an item in the BOM that is produced on the other site?
↧