Hi, i'm facing an issue with costing version on a multisite environment. I have a customer who has two production sites. Raw materials are purchased on a site, then they are transfered to another site, a semi-finished product is produced there with them and then it is transfered back to the first site where the finished product is produced. All products will have standard cost so we are working with costing versions. Our intention is to update costs from raw materials on site 1. Then, when we did the calculation on site 2 to have the semi-finished product cost updated. Is there anyway that AX looks at the cost on site 1 to avoid copying the costs to the site 2? Then we would need the same behaviour to the finished product to "see" the semifished product which has its cost on site 2. I'm sure that this could be reached on AX however i'm not finding the way. Hope i had explain myself and you could help me. Thanks for your time.
↧